Skip to main content

Reduce Building Construction Cost in just simple 8 Tricks

 Hello Friends!!

Today we came with an interesting topic where our clients and those who are going to start construction are more focused.

So the topic is "How to reduce building Construction Cost".

Here we will discuss about this and we will divide this topic into three parts

Basically the reason behind dividing this topic into three parts as it has three processes like in building construction we have three phases  i.e Planning phase, Construction phase, Utilisation phase.

In this Blog we will move towards the first phase. What exactly occurs in the Planning phase?

There are 8 tricks to reduce building Construction cost.

(I) Research

   You must have a clear idea about the building which you are going to construct in future. You are ready to Construct or Not? If you are not able to understand the type of building you can consult with the nearest Building Consultant.

Remember before going to the consultant you must do some research on Construction.

Why is Research required?

   Say, you are going to invest around 50-60 lakhs in your dream home and if required you will also take some loans for the dream home. You are investing your life time savings in building your home.

In day to day life, we bargain in the vegetable market  just to save 2-3 rupees here it's about 50-60 lakhs so it's compulsory for all to do research on it.

(II) Choose Best Consultant

   In this competitive world, How to Choose the best?

You don’t have to choose the best available for everyone, you have to choose who is best for you because whatever you are dreaming about your home your consultant should understand you and your budget and be able to represent in pen and paper with proper dimension and proper view as your imagination.

For this you have to  do some tests like take some rough sketches from 4-5 consultants from nearby consultants with a very minimum cost between 2k-3k. Some consultants take high charge, no need to consult with them. To avoid high charges you can leave top 5 Consultants of your city and take 4-5 rough sketches from average consultants.

If you are going to invest 50-60 lakhs then you can easily invest 4k -5k to check your perfect consultant because if you completed the construction  and it is not like your dream home and rest of your life you are going to spend there. So be careful to choose the best one.

(III)  Survey for your Building

  In the land in which you are going to start construction work you should compulsory go for survey work because here you can easily get the exact plot dimension.If you are not able to find a team for survey, do ask your consultant to do a survey. Survey activity also play an important role in reduce building cost, which can be explained with an example below

Eg. If it is written  the size of the plot  is 30/40, but the actual site dimension is not matching, it's 29/38, which can result in delay of the construction.

How does delay in construction increase building Construction Cost?

If you are living in a rented flat, before getting shifted to your own house, you have to pay for 1-2 months extra rent due to the delay in work completion. Also you may miss out on getting  benefits on income tax etc.

(iv) Spacious not Clumsy

   Spacious rooms reduce building construction cost rather than clumsy rooms.

Eg- If you divide your room in small small parts like you put a wall between the living room and Dining room the result is that you have to give a beam beneath the wall and also could result in increase in the number and sizes of columns, footings and the whole structure in general. Hence the building construction cost will get increased due to the increase in sizes of structural members. Hence go for lesser partitions in your building which will result in spacious rooms as well as lessen the construction cost.



(v) Detailing Work

Many people think that plan is over. Why do we need detailing drawings for buildings?

What is the role of the term “detailing” to reduce building construction cost?, Let us see with the help of an example.

Eg- After completion of building you can call a carpenter and ask to do cupboards on plane walls, if you don't have the interior designs then it will definitely result in more cost in comparison to if  you would have made the designs beforehand. If you had the interior designs ready then you already know how the room is going to look beforehand and hence while building construction you could know where to put extra walls ( for cupboards)  to reduce material cost.


Likewise in the case of Building Core-House Construction, make sure you take Structural Drawing and Detailing, from your consultant. The structural drawings will contain the position, sizes and reinforcement details of all the structural members, like beam, column, footing (foundation), slab, staircase etc.

(vii)  Soil Test

    If your plot is small or less than 1500 sq ft soil test may not be required but if your plot size is more than that and you are going to construct G+1 or G+2 the cost will be nearly 40 lakhs on the conservative side, it is strongly recommended.

Why is the soil Test required?

 Nowadays everyone is preferring framed structure and here the main three structural components are column, beam and footing (Foundation). The design of foundation solely depends upon the properties of soil, there are some numerical values also like the value of Soil Bearing Capacity which is required for the design of foundation and type of foundation to be provided for the building (shallow foundations like isolated footing or deep foundation like Piles).

If the soil test report is available the Structural Consultant can design the foundation considering safety as well as economy, whereas if any soil test report is not available the consultant will be forced to go on the conservative design which may be uneconomical if the soil is good and unsafe if the soil properties are worse then assumed by the structural consultant.


(viii) Choose Economic Material

   If in your city the rate of fly ash bricks are less than red bricks then go for fly ash bricks. There is a common perception that red bricks have high compressive strength so they should be used, but logically in a framed structure (having beams and columns) the wall doesn’t take any load; they only act as partitions. In addition lighter partition materials also result in lesser loads on structural members which in turn can reduce their sizes and save the construction cost.




We also have AAC blocks in the market who have lighter weight.

How does it affect reducing Building Construction Cost?

AAC blocks are 50 percent lighter than fly ash or red bricks and If your wall weight is light it will reduce the size of beams and other structural members as discussed above.


It can be inferred from the above points that it's necessary to hire a consultant who is best for you and  discuss everything with them before going to start your home.

These are 8 tricks in the planning phase. We will also discuss reducing construction cost in the construction phase. Stay tuned

Thank you


You can watch our Youtube Video Related to this Topic: How to Reduce Our Building Construction Cost (Part-1)



About us: Civil Center is a Civil Engineering Consultancy company which provides services ranging from Building Consultancy Services like Architectural Plan, Structural Drawing, Estimation, 3D Views of Interior and Exterior of a Building, Construction Planning and Management, and also other services like Survey Investigation Works.


We also provide industrial Training to Civil Engineering Students as well as professionals which include courses on Building Design, Detailing Estimation, 3D Modelling and Survey  by using Software like STAAD. Pro, Tekla Structural Designer, Revit Structures, Tekla Structures, MS Excel, E-Survey. In training our goal is to make our trainees ready for the industry by getting them trained in Live Projects. We also provide placement assistance to our trainees.


Visit our Website: http://www.civilcenter.in/


You Can Find Us On Other Social Media

Visit our Facebook Page: https://www.facebook.com/civilcenter/

Visit our LinkedIn Page: https://www.linkedin.com/company/civil-center

Follow our Twitter Handle: https://twitter.com/_CivilCenter

Follow us on Instagram: https://www.instagram.com/civilcenter17/

Comments

Popular posts from this blog

How to study the Reinforcement Drawings of beams which have been generated in TSD.

Tekla Structural Designer is advanced software used for Structural Analysis and Design of a Building. In Tekla, we can do the detailing of steel structures as well as RCC structures. We can create RCC buildings and we can insert the rebars in Tekla structures Designer software.  We can also do the form works and structural drawing without the help of any other software. Let’s go step by step to learn how to study the Reinforcement Drawings of beams that have been generated in TSD. Step 1 As we can see, this building has been fully designed and analysed. Now, just right click on the beam then click on the report for the member and it will generate the report for the member and we will see this and after that, we can also check the file for the particular beam.     Fig.1 Step 2 Now we have 3 numbers of sections, for each beam, it has been made and the respective cross-section is also given. Step 3 Now if we just go through the drawing, we can see that we have 2 bars of 16mm at the top an

How to Provide Reinforcement in multiple columns in Tekla Structures

  Tekla Structures is a Building Information Modeling (BIM) software able to model structures that incorporate different kinds of building materials, including steel, concrete, timber and glass. However it is widely used for the detailing of structural drawing.  In this blog, we are going to discuss how  to provide reinforcement in multiple columns in Tekla Structures.  So let's start the step by step procedure Step 1 : At first we must make sure that our model is correct and after that we will look for the column reinforcement application.   Step 2 : Search result will give us lots of options which includes application of column (for both the RCC and steel).  Step 3 : Now from there we have to select an app for RCC. column.  Step 4 : We will go for Application no. 57 which is "Column automated reinforcement layout". Step 5 : Select and define the application according to our requirement. Now select all the columns by dragging the mouse from right to left. It will select

STAAD Pro Vs Tekla Structural Designer .Which One Is Better ?

  Tekla Structural Designer (TSD) is a simple, integrated design & analysis software that enables engineers to deliver safe, effective and rationalized design more quickly, regardless of structural material. Reinforcement drawings for the entire building or tonnes of steel for estimating and many more.    So in the above image you can see the first image is created in Tekla Structural Designer (TSD) and in the second image the model has been created in Staad Pro  . we can start the comparison with the grid lines. So for creating grid lines in staad we need to enter the coordinates from the beam column plan as shown in fig.1 and we need to insert it while viewing the beam column plan. Fig 1 We can create grid lines in Tekla Structural Designer directly and in addition        you can also import the beam column plan as shadow as shown in fig 2 .  Fig. 2 • Next step is adding members in staad pro so in addition we need to see the beam column plan again and again so that we can place